Yian News

The new “building artifact”, the new speed of prefabricated construction!

2022-12-12

The new “building artifact”, the new speed of prefabricated construction!

In the main construction of prefabricated concrete structures and aluminum alloy formwork, the protection work can only be carried out with the help of attached lifting scaffold and floor-hanging scaffold. Due to the large volume of the project, it is difficult to meet the requirements of the construction schedule by using the traditional cantilevered steel scaffold, so the climbing construction platform is adopted to solve the problems of high construction cost and slow construction period of the construction project.

Yi 'an climbing construction platform is a new type of building protection equipment with simplified process, time-saving, safe and reliable, and fast construction speed. It is mainly used in the construction of prefabricated concrete structure, steel structure and the main structure of aluminum alloy formwork.

The platform adopts the motor and the gear of the output shaft of the reducer installed on the drive unit frame and the rack on the vertical column standard section structure column. The drive unit is reliably connected with the operating platform. When the drive unit strictly vertical column standard section structure column rises or falls, it drives the operating platform to rise or fall as a whole. It is composed of fixed base, driving device, column standard section, platform section, operating platform, protective frame, wall attachment fitting, anti-fall device and other components.

1. Yi 'an climbing construction platform can not only meet the construction protection requirements of the main structure, but also carry out the exterior wall decoration of the structure immediately after the completion of the main construction. Greatly shorten the main structure to the secondary structure decoration connection time, improve work efficiency. And can go up and down at any time.

2. The main force is transferred to the foundation through the vertical standard section, and the force form is more stable.

3. The reserved hole is only in the column standard section position less, more convenient installation.

4. The installation saves time, labor and materials.

5. Assembly and demolition are carried out on the ground to avoid safety risks of disintegration at high altitude.

6 in the secondary structure construction process can replace the construction elevator, save costs.

7. The transport of personnel and materials can be carried out efficiently and accessibility to hard-to-reach areas improved.


0
Previews:Safety precautions for construction hoist
Next:Special construction elevator in the well