Case Study

Construction elevator case

2022-12-26

Xingtai project

The cross-sectional area of the mast section is 650X200(LXW).

The cage is designed as an integrated assembly structure, so the hoist can be used in various working conditions.

The intelligent degree of the control system is relatively high, and the one-key operation is adopted; the leveling and stopping functions of the hoist are automatic, and their accuracy is relatively high.
The safety detection system is fully CNC mode.
0
Previews:Well construction elevator case
Next: Industrial elevator case